The Velocity Paradox
"Why Did We Get Slower After Hiring 10 More Engineers?"
You scaled your team. Now you're in meetings all day. Nothing ships. ProdMoh replaces "alignment meetings" with specs โ so new hires ship without you holding their hand.
The 11 PM Thought
What you're thinking while staring at the ceiling:
"I miss the days when it was just three of us in a room. We shipped daily. Now we have 30 people, we spend all week in 'syncs' and 'alignment meetings,' and we shipped... nothing this week. I feel like I'm paying for overhead, not output."
After reviewing the sprint:
"Half the tickets are 'blocked โ waiting for clarification' or 'blocked โ needs design input.' We have 5 meetings scheduled tomorrow to unblock them."
After the new hire standup:
"They've been here 3 weeks and are still 'getting context.' Meanwhile, I have to review their PR and explain why it doesn't match what we discussed."
Looking at the burn rate:
"We're paying $1.5M/year in engineering salaries. Our biggest output last month was 2 bug fixes and 1 minor feature. That's... $500k per feature?"
Every Monday morning:
"The new team built it wrong. 'That's not what we discussed.' Now we're redoing 2 weeks of work. The original 3 of us would have just done it right."
The Real Problem
When you hire fast, communication breaks
Result: 3 weeks to ship what should take 3 days
Result: Async handoff. No meetings. Ship in days.
ProdMoh: Your Async Architect
Turn your raw vision into rigid technical specs instantly. New hires ship without hand-holding.
Replace Alignment Meetings With
Instant Specs
The spec is the alignment. Engineers read it, build it, ship it.
New hires get context from specs, not from asking you the same questions.
Edge cases and acceptance criteria are defined upfront. No "that's not what I meant."
The Math
What replacing meetings with specs actually saves
40+
hours/week saved
8 hrs ร 5 engineers = 1 full FTE
$150K
per year saved
Time you're paying for that goes to shipping
3x
faster feature velocity
No more "that's not what I meant" rebuilds
Simple math: If each engineer spends 8 hrs/week in "alignment" calls, a 5-person team loses 40 hours/week โ that's a full engineer's worth of output, every single week. ProdMoh gives that back.
Stop Paying for Overhead
Your 30-person team should ship more than your 3-person team. Replace meetings with specs.
Try ProdMoh FreeFree tier available ยท No credit card required
Explore more use cases